Choose Hengqiao, entrust with confidence! Step by step, the construction of offshore wharves is reliable
Pre-preparation: Parallel deep investigation and customized planning
During the preliminary survey, most companies may only conduct routine research on the basic conditions of the site. However, Hengqiao Marine Engineering is different. Its team not only conducts detailed surveys on natural factors such as terrain, water depth, water level drop, tide, water flow, and wind and waves, but also deeply understands customers' expectations for dock functions, future usage frequency, and special needs. For example, when designing a dock for a high-end yacht club, considering members' pursuit of privacy and exclusive experience, Hengqiao Marine Engineering specially set up independent berth areas and private leisure platforms in the planning layout, which are effectively separated from public areas. This is a customized and in-depth planning that ordinary companies find difficult to achieve.
Material selection: global selection and pursuit of ultimate performance
To control costs, general enterprises may tend to choose common materials. However, as an industry leader, Hengqiao Marine Engineering insists on using 100% high molecular weight and high density HDPE materials imported from Saudi Arabia or Qatar for its dock buoys. After adding UV-resistant substances, this material can withstand harsher natural environmental changes and low temperature impacts, with its weather resistance improved several times compared to ordinary materials. At the same time, in terms of the selection of main structural materials, Hengqiao Marine Engineering often adopts hot-dip galvanized steel structures instead of ordinary steel, thereby enhancing structural stability and durability, and ensuring long-term stable use of the dock from the source.
Construction technology: innovative technology and high-precision control
In the foundation construction phase, other companies may follow conventional procedures. However, Hengqiao Marine Engineering flexibly adopts various methods such as steel pipe piles and PHC concrete pipe piles based on the wharf design and geological conditions, and utilizes advanced equipment and technology to control the precision of foundation construction to the millimeter level. For example, when constructing a wharf in a complex geological area, through precise geological analysis, special pile types and piling techniques are adopted, making the foundation stability far exceed industry standards. During the main structure construction, Hengqiao Marine Engineering uses BIM technology to simulate the force distribution of the wharf structure under different working conditions, optimizes the construction plan in advance, and controls the error to a very small range when splicing the buoys and skeletons, ensuring the safety and reliability of the wharf structure during long-term use.
Quality inspection: stringent standards and comprehensive tracking inspection
Many enterprises may only conduct simple spot checks at key nodes during quality inspection. However, Hengqiao Marine Engineering has established a full-process tracking and inspection system, where professional personnel are responsible for quality control from the inspection of each batch of materials upon arrival to the rigorous verification after the completion of each process during construction. The performance indicators of the buoys, such as tensile strength and impact strength, are strictly tested in accordance with ASTM standards. Additionally, multi-dimensional and comprehensive testing is conducted on the overall structure of the dock to ensure that its quality not only meets but also exceeds industry standards, delivering high-quality and high-safety dock projects for customers.
