Edit date :2018.9.18
Editor: guangzhou hengqiao offshore engineering co. LTD
On September 16, 2018, super typhoon "shanzhu" registered in guangdong province, bringing a long period of heavy rain to heavy rain in guangzhou, with the maximum land gusts reaching level 13 and the gusts of guangzhou port area reaching level 14 to 15, which were extremely destructive and seriously affected our province!
Set the ring should be
Swire warehouse yacht club received the provinces and cities at all levels of government departments, the guangzhou port group on the defensive and business travel company issued by 2018 super typhoon "shanzhu" work notice, after study evaluated the typhoon may be the effects on the swire warehouse wharf, quickly the typhoon work meeting, arrange the typhoon during typhoon flood control work, the key defense strong typhoon "components". By virtue of the geographical advantages of the natural harbor and excellent flood control measures, the wind and flood control work of no. 22 super typhoon shanzhu has been completed excellently.
Super typhoon is fierce, a number of places in guangzhou have been damaged to varying degrees, what is so that the taigu warehouse marina to maintain this "stable happiness"?
Natural geographical advantage
The swire wharf is located in the inner port of guangzhou, away from the sea, which can form better cover conditions in the port, with less wind and waves, and is suitable for the yacht to avoid the wind and waves in the port.
Secondly, at the beginning of the construction of the entire wharf of swire warehouse, the overall design, building materials, construction technology and moisture-proof measures were quite scientific and rigorous. Coupled with the transformation of modern science, it is more stable and reasonable.
Strong defense level
Taigu warehouse marina design yacht pier anti - flood work program, with typhoon 12 and above. Typhoon prevention measures of category 12 or above:
1. Relevant departments shall do a good job in typhoon prevention and emergency response according to their duties;
2. Stop large indoor and outdoor gatherings, classes and business operations (except for special industries);
3. When working on the water in relevant waters and vessels passing by, they shall return to port to take shelter from the wind, strengthen port facilities and prevent vessels from anchor, grounding and collision.
4. To reinforce or remove structures that are easily blown by the wind, people should stay in a place as safe as possible. When the typhoon center passes, the wind will decrease or remain stationary for a period of time.
Excellent defensive measures and experience
Our company organized the work meeting quickly, held the work meeting quickly according to the established anti-typhoon emergency plan, determined the anti-typhoon and anti-typhoon emergency plan, made preparations for anti-typhoon and closely followed the real-time release system of typhoon path.
On September 14, our company implemented the emergency work plan of typhoon control and flood control, notified the ship owners who berthed the yacht to transfer the personnel safely, arranged the ship owners of the marina to conduct self-inspection, strengthened the port facilities of the marina and monitored the water level of the port.
As early as before the "mountain bamboo" typhoon, taigu warehouse yacht dock has sufficient defense Taiwan experience, every time when the typhoon comes, we will make full preparations for defense Taiwan, and strive to resist every typhoon.
The sailors reinforce the yacht and increase the ball collision. Meanwhile, the company leaders, site leaders, captains and sailors are on duty to pay close attention to the changes of "shanzhu", and continuously inspect the pier and typhoon monitoring, so as to make emergency measures, so that the ship owners can safely dock at the taikoo warehouse yacht dock.
Taikoo bin yacht will continue to be serious and rigorous in every typhoon defense work, implement the site details, make full preparations, never take lightly, so that the yacht owners will rest assured that the ship safely berthed taikoo bin yacht dock.
About emergency plan, what need to notice again?
According to the forecast of typhoon path and wind, find the nearest best shelter. The design and construction of jetties such as breakwaters and floating quays is also one of the variables of the platform work.
From many experiences, it can be seen that the loss of typhoon is caused by human factors, and the way of berthing vessels according to the bearing capacity of berths and mooring with special heart can also reduce many losses for us.
In fact, the storm surge is much more harmful than the wind. As the storm surge water level rises, the lack of scientific mooring length will lead to a series of chain accidents.
Contact: 0086-139 0240 2448 Tim Hui
Phone: 13660108188 15920552310
Tel: 020-82396205
Email: gzhengqiao@163.com
Add: Room 658, 6th floor, Yufeng Business Center, 2 Jinghu Avenue, Huadu District, Guangzhou City